電纜橋架的優化安裝措施

(1)施工單位要根據設計圖紙及其說明,對管線走向、整個橋架安裝過程進行深入了解。同時還要考慮到橋架安裝過程中可能出現的橋架是否過長、是否存在變形縫等問題,并且及時地設置相應的補償措施。
(1) The construction unit shall have an in-depth understanding of the pipeline direction and the whole bridge installation process according to the design drawings and their instructions. At the same time, we should also consider whether the bridge may be too long and whether there are deformation joints during the installation of the bridge, and set corresponding compensation measures in time.
(2)加強對接地線的設置。施工單位在施工過程中,要采用截面積>4 mm2的接地線,保證接地線的質量,對于跨接地的線路要進行接地,要把接地干線固定在橋架的支架和吊架上,金屬橋架及其支架和吊架要進行接地處理。對于鍍鋅的電纜橋架,在其連接處要使用連接板進行固定,連接板的兩端可以不使用跨接接地線(但是連接板的端部要使用防松墊圈);還要注意避免將接地干線直接焊接在橋架上,要對電纜橋架噴塑層的脫落部分進行去銹處理,再刷防銹漆,防止橋架的腐蝕。要在電纜橋架的兩端端口、每隔30m的直線段、變形縫的連接兩端處等部位與接地干線連接,要確保電纜橋架存在多于兩處與接地干線連接。
(2) Strengthen the setting of grounding wire. During the construction, the construction unit shall adopt the grounding wire with a cross-sectional area of >4 mm2 to ensure the quality of the grounding wire. The cross grounding line shall be grounded, the grounding main line shall be fixed on the supports and hangers of the bridge, and the metal bridge and its supports and hangers shall be grounded. For the galvanized cable tray, the connecting plate shall be used for fixing at its connection, and the jumper grounding wire may not be used at both ends of the connecting plate (but the end of the connecting plate shall use a lock washer); Attention should also be paid to avoid welding the grounding main line directly on the bridge. The falling part of the plastic spraying layer of the cable bridge should be derusted, and then painted with antirust paint to prevent the corrosion of the bridge. Connect the two ends of the cable tray, the straight-line sections every 30m, the connecting ends of the deformation joints and other parts with the grounding main line, and ensure that there are more than two connections with the grounding main line in the cable tray.
(3)加強對電纜橋架與管道距離的控制。在安裝時,施工單位要對纜橋架、給排水管道、空調管道、熱力管道等的走向及交叉問題進行綜合考慮,嚴格按照管道走向的布置圖進行安裝,確保電纜橋架與管道之間保持合理的距離。確保電纜橋架不設置在熱力管道的上方,與熱力管道保持合理的距離,若是電纜橋架與熱力管道距離較近,就要設置相應的隔熱措施。
(3) Strengthen the control of the distance between cable tray and professional pipeline. During installation, the construction unit shall comprehensively consider the direction and intersection of cable trays, water supply and drainage pipelines, air conditioning pipelines, heating pipelines, etc., and install in strict accordance with the layout of pipeline direction to ensure that a reasonable distance is maintained between cable trays and pipelines. Ensure that the cable tray is not set above the heat pipe, and keep a reasonable distance from the heat pipe. If the cable tray is close to the heat pipe, corresponding heat insulation measures should be set.
以上就是為大家介紹的有關山東電纜橋架的詳細的介紹,希望對您有所幫助.如果您有什么疑問的話,歡迎聯系我們.我們將以的態度,為您提供服務http://m.offroader.com.cn
The above is a detailed introduction about Shandong cable tray, which I hope will be helpful to you If you have any questions, please contact us We will provide you with professional service http://m.offroader.com.cn
 
qq
售前咨詢熱線
15168870138
售后咨詢熱線
13465410318
主站蜘蛛池模板: 日本mv精品中文字幕 | 欧美同志gaypronvideos | 思思玖玖 | 成年男女免费视频网站 | 91短视频在线免费观看 | 动漫美女被吸乳羞羞小说 | 亚洲成av人在线视 | 玩50岁四川熟女大白屁股直播 | 美女被扣逼 | 欧美一区二区三区精品 | 男人久久天堂 | ass性强迫rape | 3344在线看片 | 国产东北三老头伦一肥婆 | 日产精品卡一卡2卡三卡乱码工厂 | 国产青草亚洲香蕉精品久久 | 亚洲天堂在线视频观看 | 网友自拍咪咪爱 | 精品午夜视频 | 欧美yyy| 女生被草| 久久这里只有精品视频9 | 精品国产无限资源免费观看 | 欧美一区二区三区免费看 | 国产美女做爰免费视频软件 | 秋霞网毛片 | 精品亚洲永久免费精品 | 9自拍视频在线观看 | 丁香五香天堂 | 图片专区小说专区卡通动漫 | 女生被爆操 | 色悠久久久久综合网小说 | 免费精品99久久国产综合精品 | 男人机机桶女人 | ai换脸明星专区在线观看 | 国内久久 | 网红思瑞一区二区三区 | 日韩伦理在线看 | 国产亚洲精品美女2020久久 | 婷婷网址 | 无遮18禁在线永久免费观看挡 |