電纜橋架安裝在不同場合如何接地

在我們使用橋架的過程中,根據其安裝的場合不同,其采用的接地方式也是不一樣的,那么您知道分別采用的什么樣的接地方法嗎?下面我們為您整理相關內容。
In the process of using the bridge, the grounding methods are different according to the different installation occasions. Do you know what grounding methods are used respectively? Now we'll sort out the relevant contents for you.
在我們使用橋架的過程中,根據其安裝的場合不同,其采用的接地方式也是不一樣的,那么您知道分別采用的什么樣的接地方法嗎?
In the process of using the bridge, the grounding methods are different according to the different installation occasions. Do you know what grounding methods are used respectively?
橋架可能存在的安裝場合以及如何接地的情況有以下三種:
There are three possible installation occasions and grounding conditions of the bridge:
1、當允許利用橋架系統構成接地干線回路時,橋架端部之間連接電阻應不大于0.00033歐姆 ,接地孔應絕緣涂層。在1KV及以下中性點直接接地系統中,受電設備的接地與系統中性線接地相連。
1. When it is allowed to use the bridge system to form the grounding trunk circuit, the connection resistance between the ends of the bridge should not be greater than 0.00033 ohm, and the insulation coating should be removed from the grounding hole. In the 1kV and below neutral point direct grounding system, the grounding of the power receiving equipment is connected with the neutral line grounding of the system.
2、裝有處動切斷供電裝軒時,橋架的級長方向金屬橫截面積應不小于規定值。沿橋架全長另敷設接地干線時,每段(包括非直線 段)橋架應少有一點與接地干線可靠連接。
2. When installing the power cut-off device, the metal cross-sectional area in the level direction of the bridge should not be less than the specified value. When another grounding main line is laid along the whole length of the bridge, at least one point of each section (including non-linear section) of the bridge shall be reliably connected with the grounding main line.
3、對于振動場所,橋架不同的安裝場合的接地要點說明:在接地部位的連接處應裝置彈簧圈。
3. For vibration sites, the key points of grounding for different installation sites of the bridge: spring rings should be installed at the connection of the grounding parts.
電纜橋架之間可利用連接板作為跨接線,把橋架連成一體。在連接板兩端的兩只連接螺栓上加鍍鋅彈簧墊圈,橋架之間用軟銅線進行跨接,再將橋架與接地線相連,形成電氣通路。橋架整體與接地干線應有不少于兩處的連接。接地作業完成后需要檢查驗收。
Connecting plates can be used as jumpers between cable trays to connect the trays into one. Galvanized spring washers are added to the two connecting bolts at both ends of the connecting plate, and soft copper wires are used for bridging between the bridge, and then the bridge is connected with the grounding wire to form an electrical path. There shall be at least two connections between the whole bridge and the grounding main line. Inspection and acceptance are required after the completion of grounding operation.
以上就是為大家介紹的有關山東電纜橋架的詳細的介紹,希望對您有所幫助.如果您有什么疑問的話,歡迎聯系我們.我們將以的態度,為您提供服務http://m.offroader.com.cn
The above is a detailed introduction about Shandong cable tray, which I hope will be helpful to you If you have any questions, please contact us We will provide you with professional service http://m.offroader.com.cn
 
qq
售前咨詢熱線
15168870138
售后咨詢熱線
13465410318
主站蜘蛛池模板: 欧美高清日韩 | 国产亚洲福利一区二区免费看 | 动漫美女人物被黄漫在线看 | 精品日韩欧美一区二区三区 | xxxx意大利xxxxhd| 無码一区中文字幕少妇熟女网站 | 国产精品啪啪 | 韩国三级理韩国三级理人伦 | 精品无人区乱码1区2区3区在线 | 日日摸日日添日日透 | 国产japanese孕妇孕交 | 五月香婷| 免费看日韩 | 日本色播 | 国产在线精品成人一区二区三区 | 久久99re热在线观看视频 | 免费一区在线观看 | 摄像头东北对白清晰 | 亚洲精品国产成人中文 | 人与动人物aaaa | 视频在线观看一区二区三区 | 污黄在线观看 | 超碰97 | 亚洲网站大全 | 亚洲精品人成网在线播放影院 | 爱欲荡漾在线观看 | 精品一区二区高清在线观看 | 明星梦淫 | 无人在线视频高清免费播放 | 亚洲国产成人在线视频 | 天美蜜桃精东乌鸦传媒 | 荡女淫春2未删减版 | 国产区一二三四区2021 | 久久精品亚洲精品国产欧美 | 国精品午夜dy8888狼人 | 韩国帅男同gay网站 韩国三级在线播放 | juliaann丝袜精品系列 | 嫩草影院永久在线播放 | 色噜噜 男人的天堂在线观看 | 91美女在线视频 | 国产好深好硬好爽我还要视频 |