橋架安裝在不同場合如何接地

在我們使用橋架的過程中,根據其安裝的場合不同,其采用的接地方式也是不一樣的,那么您知道分別采用的什么樣的接地方法嗎?下面我們為您整理相關內容。
In the process of using the bridge, the grounding methods are different according to the different installation occasions. Do you know what kind of grounding methods are used? Next, we will sort out the relevant content for you.
橋架可能存在的安裝場合以及如何接地的情況有以下三種:
There are three possible installation situations and grounding methods for the bridge:
1、當允許利用橋架系統構成接地干線回路時,橋架端部之間連接電阻應不大于0.00033歐姆,接地孔應絕緣涂層。在1KV及以下中性點直接接地系統中,受電設備的接地與系統中性線接地相連。
1. When the bridge system is allowed to form the grounding trunk circuit, the connection resistance between the ends of the bridge should not be greater than 0.00033 ohm, and the insulation coating should be removed from the grounding hole. In the 1kV and below neutral point direct grounding system, the grounding of the receiving equipment is connected with the neutral line of the system.
山東電纜橋架
2、裝有處動切斷供電裝軒時,橋架的級長方向金屬橫截面積應不小于規定值。沿橋架全長另敷設接地干線時,每段(包括非直線段)橋架應少有一點與接地干線可靠連接。
2. When installing the dynamic cut-off power supply installation, the metal cross-sectional area in the direction of the bridge length shall not be less than the specified value. When another grounding main line is laid along the whole length of the bridge, at least one point of each section (including non-linear section) of the bridge shall be reliably connected with the grounding main line.
橋架安裝在不同場合如何接地
How to ground the bridge in different occasions
3、對于振動場所,橋架不同的安裝場合的接地要點說明:在接地部位的連接處應裝置彈簧圈。
3. For vibration places, the grounding points of different installation occasions of bridge: spring coil should be installed at the connection of grounding parts.
電纜橋架之間可利用連接板作為跨接線,把橋架連成一體。在連接板兩端的兩只連接螺栓上加鍍鋅彈簧墊圈,橋架之間用軟銅線進行跨接,再將橋架與接地線相連,形成電氣通路。橋架整體與接地干線應有不少于兩處的連接。接地作業完成后需要檢查驗收。
The connecting plate can be used as the jumper wire between the cable trays to connect the trays as a whole. Galvanized spring washer is added on the two connecting bolts at both ends of the connecting plate. The bridge is bridged with soft copper wire, and then the bridge is connected with the grounding wire to form an electrical path. There shall be no less than two connections between the whole bridge and the grounding main line. After the completion of grounding operation, inspection and acceptance are required.
 
qq
售前咨詢熱線
15168870138
售后咨詢熱線
13465410318
主站蜘蛛池模板: 4438全国最大免费观看 | 白丝vk丨tk失禁 | 欧美bbxx| 欧美最猛性xxxxx短视频 | 操熟美女又肥又嫩的骚屁股 | 国产一区二区三区免费在线视频 | 亚洲日本中文字幕天天更新 | 男人狂躁女人下半身 | 五月天久久久 | 边摸边吃奶又黄激烈视频韩国 | 日韩免费高清专区 | 美女全身无遮挡 | 精品欧美一区二区三区在线观看 | 久久精品午夜一区二区福利 | 久久精品嫩草影院免费看 | 成全视频在线观看免费 | 午夜免费体验30分 | 忘忧草秋观看未满十八 | 2023毛片| 欧美视频一区二区三区在线观看 | 国内久久| 91极品女神久色在线播放 | 星空无限传媒xk8046 | 日韩精品免费一区二区三区 | 亚洲人成在线观看一区二区 | 美女的隐私视频免费看软件 | 国产一卡 | 糖心在线观看 | 色天天综合色天天碰 | 美女翘臀跪床被打屁股作文 | 奇米影视77777 | 草嫩社区 | sese在线播放| 国产欧美视频在线观看 | 成人精品一区二区三区 | 欧美亚洲国产精品久久久 | 99久久99久久久精品齐齐鬼色 | 国产爽视频 | 五月最新商场女厕所高跟嘘嘘 | 亚洲一二三区视频 | 久久偷拍人|