日本jizz强视频69视频-日本h在线精品免费观看-日本h在线观看-日本h肉动漫在线观看免费-日本a中文字幕-日本a在线天堂

網(wǎng)站公告-NOTICE
航豐實(shí)業(yè)·產(chǎn)品分類
聯(lián)系我們
濟(jì)南航豐實(shí)業(yè)有限公司

電話:15168870138
聯(lián)系人:龐經(jīng)理

網(wǎng)址:http://m.offroader.com.cn  

廠址: 德州市禹城市莒鎮(zhèn)產(chǎn)業(yè)園26棟

經(jīng)銷商地址:天橋區(qū)建華五金市場東區(qū)5-1  

魯ICP備09095923號(hào)-1

新聞資訊

當(dāng)前位置:首頁 / 新聞資訊

安裝電纜橋架時(shí)會(huì)有哪些誤區(qū)嗎?

說到電纜橋架,很多人對其都是很熟悉的,主要是起到支撐和保護(hù)電纜的作用。那你知道防火電纜橋架在安裝時(shí)會(huì)有哪些誤區(qū)嗎?
When it comes to cable tray, many people are very familiar with it, mainly to support and protect the cable. Do you know the mistakes in the installation of fireproof cable tray?
電纜橋架在設(shè)置的時(shí)光非但提到到橋架的安上還需考慮到電纜的走向以及細(xì)節(jié)處理問題。同時(shí),供與電纜裝置的橋架部類饒有,每一種橋架也富有不同的安裝特性。
In the setting of cable tray, not only the installation of cable tray is mentioned, but also the cable direction and detail treatment should be considered. At the same time, there are many types of cable tray for cable installation, and each type of cable tray has different installation characteristics.
1.螺桿吊架設(shè)置橋架時(shí),未按標(biāo)準(zhǔn)要求設(shè)置防晃支架,鋼支架未按防腐要求施工。
1. When the screw hanger is set with bridge, the anti sway support is not set according to the standard requirements, and the steel support is not constructed according to the anti-corrosion requirements.
濟(jì)南電纜橋架
2.接地跨接線在橋架兩側(cè)任性安設(shè)或漏跨接,接地跨接線不設(shè)在顯眼側(cè)。接地跨接線的線鼻與爪形墊片壓接依次裝反,有的未設(shè)爪形墊片,鍍鋅橋架接地螺栓未有防松墊圈。
2. The grounding jumper is arbitrarily installed or missed on both sides of the bridge, and the grounding jumper is not set on the conspicuous side. The lug and claw gasket of grounding jumper are installed reversely in turn. Some are not equipped with claw gasket, and the grounding bolt of galvanized bridge is not equipped with lock washer.
3.吊頂內(nèi)托盤、槽式橋架蓋板漏蓋。橋架連接板的固定螺栓的螺母裝在橋架內(nèi)側(cè),橋架和配電箱、柜及接出或接入的鋼管等未做接地接連。
3. The tray and trough bridge cover plate in the ceiling are missing. The nuts of the fixing bolts of the bridge connecting plate are installed on the inner side of the bridge, and the bridge is not connected to the distribution box, cabinet and the outgoing or incoming steel pipes.
4.五金電纜橋架及其支架全長沒做可靠接地,未按正規(guī)化務(wù)求裝置伸縮節(jié)。
4. The full length of hardware cable tray and its support is not reliably grounded, and the expansion joint is not installed according to the normalization.
5.電纜橋架與托架間未固定,橋架支架未做接地跨接線,穿越防火分區(qū)未做防火梗阻。
5. The cable tray and bracket are not fixed, the bridge bracket is not provided with grounding jumper, and the fire prevention obstruction is not provided when crossing the fire compartment.
6.鋁合金橋架與鋼支架間未做防電化風(fēng)剝雨蝕的絕緣處理。防火電纜橋架橋架彎頭、三通等不采用與橋架配套的產(chǎn)品零配件,而是當(dāng)場加工打造,加工成色不符合規(guī)范務(wù)求。
6. There is no insulation treatment between aluminum alloy bridge and steel support to prevent electrification, wind and rain erosion. The elbow and tee of fire-proof cable tray do not use the parts matching with the cable tray, but are processed on the spot, and the processing quality does not meet the specification.
 
qq
售前咨詢熱線
15168870138
售后咨詢熱線
13465410318
主站蜘蛛池模板: 日本妇人成熟免费不卡片 | 国产一卡二卡3卡4卡四卡在线视频 | 久久黄色免费 | 国产女王女m视频vk 国产农村一级特黄α真人毛片 | 亚洲人的天堂男人爽爽爽 | 啊啊啊好大在线观看 | 欧美一卡二卡科技有限公司 | 九九九久久久 | 污到湿的爽文免费阅读 | 成人男女啪啪免费观看网站 | 日本精品久久久久中文字幕 1 | 99视频在线看观免费 | 第四色男人天堂 | a毛片免费观看完整 | 秋霞在线一级 | 国语自产拍在线播放不卡 | 亚洲 国产精品 日韩 | 男人天堂资源网 | 精品网站一区二区三区网站 | 小sao货水好多真紧h的视频 | 日本96在线精品视频免费观看 | 美女被免费视频 | 久久精品123| 久久中文字幕综合不卡一二区 | 午夜影院费试看黄 | 精品国产一级毛片大全 | 国产日韩高清一区二区三区 | 火影忍者小南裸羞羞漫画 | 成人一区二区丝袜美腿 | 菠萝视频5正版在线观看 | 国产夜趣福利第一视频 | 国内精品91久久久久 | 极致堕落(高h)| 免费看黄色大片 | 亚洲香蕉伊在人在线观婷婷 | 男人日女人的b | 舔逼 | 污污免费 | 欧美激情精品久久久久久不卡 | 国产精品xxxav免费视频 | 污到湿的爽文免费阅读 |